Some digital pressure testing methods used in the oil and gas (O&G) industry rely on predictive early data trends to draw conclusions about future performance. While these approaches may appear sophisticated, they often depend on assumptions that can be misleading. In safety-critical operations, the consequences of being wrong can be very dangerous.
At IPT Global, our approach is grounded in physics: how equipment actually behaves under pressure and an array of thermal variables. Our SureTec® PressureTesting solution focuses on measurable system behavior rather than early-time trends and predictions, which provides greater assurance, protecting people, assets, and the environment.
During well control equipment pressure testing, a pressure decline can result from three distinct causes:
Why is this a problem? Because all three occur at the same time, and their combined effects appear as a single pressure curve making interpretation more challenging than it first appears.
Many digital pressure testing tools attempt to determine a pass or fail by observing how pressure decline slows over time. However, thermal and elastic effects naturally dominate early behavior and always attenuate. This early stabilization can create the appearance of improvement even when a real leak is present.
In short, early-time prediction alone does not confirm integrity, but rather introduces uncertainty at precisely the point where certainty is required.
Rather than predicting what might happen, IPT Global’s PressureTesting solution models how a leak-free system should behave. We account for normal pressure changes caused by temperature and equipment expansion, establish a physics-based fingerprint for a healthy system, and evaluate subsequent tests against that baseline to identify true integrity failures.
Our focus is on delivering accurate, objective digital pressure testing results. In practice, that means fewer assumptions and clearer answers during the test itself. Instead of relying on trend-based prediction, we ask a more fundamental question: Does the observed behavior match that of a leak-free system?
A major offshore operator evaluated IPT Global’s physics-based PressureTesting solution against a competing predictive pressure testing solution using real subsea blowout preventer (BOP) test data, including tests with confirmed visible leaks.
IPT Global correctly identified every known failure. The predictive solution, however, incorrectly passed multiple tests, including some with confirmed visible leaks.
A false pass, indicating equipment integrity when a failure exists, can expose operations to safety risks, environmental damage, unplanned downtime, and reputational harm.
Ultimately, when people, assets, and the environment are on the line, uncertainty should never be mistaken for insight. Physics-based analysis replaces assumption with understanding and delivers the confidence that safety-critical decisions demand.
Contact IPT Global to learn more about our advanced digital pressure testing solution.
If we all had one magical wish, many of us would choose the ability to see into the future—pick the right lottery numbers, avoid costly mistakes, or prevent accidents before they happen. But we don’t have that luxury. We never have.
Yet in well control equipment pressure testing, the industry relies on methods that attempt to predict future outcomes based on early-time trends. That raises an important question: why would we base assurance of critical safety barriers on a guess?
During blowout preventer (BOP) and Well Barrier Element (WBE) pressure tests, pressure decline is driven by three distinct physical mechanisms:
Only one of these—the integrity failure—is the condition we are trying to detect. The other two are benign, expected behaviors.
Mathematically, the observed pressure change can be expressed as:
ΔPObserved = ΔPThermal + ΔPElastic Expansion + ΔPIntegrity Failure
Each mechanism produces a unique pressure signature. In real operations, these signatures are superimposed, producing the single pressure curve we observe during a test. Accurately interpreting that curve requires understanding—and accounting for—these physical effects, not overlooking them.
Predictive analysis methods attempt to assess whether pressure loss is attenuating toward a leak-free system. The flaw is fundamental: thermal and elastic effects always dominate early-time behavior, and they always attenuate.
As a result, predictive methods often interpret early attenuation as improvement—creating a false sense of confidence. In early pressure test time, predictive analysis is not insight; it is inference based on incomplete physics.
There is no crystal ball. Early-time pressure test prediction is, by definition, a guess.
IPT Global does not attempt to predict the future. Instead, our SureTec PressureTesting solution with advanced analytics applies physics-based algorithms to establish a leak-free fingerprint for a specific BOP test configuration.
That fingerprint reflects the expected thermal and elastic response of the system. Subsequent tests on similar systems are then evaluated against this baseline to identify true integrity failures—quickly, objectively, and without relying on trend prediction.
So which approach would you trust: a black-box predictive trend, or physics grounded in real behavior?
A major offshore operator compiled a dataset of more than 20 subsea BOP pressure tests from actual operations. The dataset included confirmed leaking tests—some identified visually by rig crews—and was used to evaluate both IPT Global’s PressureTesting and a competing predictive digital pressure testing solution.
The results were unambiguous:
Read that again. Predictive analysis passed tests that had already failed in the field, some with confirmed visual leaks.
These were not marginal cases or subjective interpretations. They were verified integrity failures that predictive software missed entirely—the exact outcome digital pressure testing is meant to prevent.
This is not an isolated result. Time and again, IPT Global’s physics-based PressureTesting solution has demonstrated superior accuracy by grounding interpretation in measurable system behavior rather than early-time trend speculation.
When IPT Global issues a pressure test pass, you can trust that your well control equipment or well barrier element is performing as intended.
When IPT Global issues a fail, you know you’ve identified a real problem—before it becomes a larger one.
The cost of a false pass is not just deferred downtime. It is a risk to people, assets, the environment, and the reputation of the operation itself.
SureTec PressureTesting reveals true leak signatures efficiently and objectively by isolating the physical behaviors that matter. This is not forecasting. It is physics-based, mathematically rigorous, and proven in the field, where real consequences exist.
In digital pressure testing of Well Barrier Elements and Well Control Equipment, uncertainty should never be mistaken for insight. Predictive methods rely on early-time trends dominated by thermal and elastic effects, creating the illusion of improvement that disappears in late time.
IPT Global’s PressureTesting solution removes this ambiguity by accounting for all contributors to pressure decay in your specific system from the beginning of the test. The result is earlier, more reliable decisions based on understanding and proof, not a guess.
IPT Global: Industry leaders in digital pressure test accuracy and well barrier assurance. Contact us today to schedule a PressureTesting demo.
Marine Well Containment Company and Helix Well Containment Group (MWCC and HWCG) are skilled in maintaining and developing capping stacks for deepwater drilling. IPT Global works with these consortiums to validate capping stack integrity prior to installation to prevent oil leaks.
Through its SureTec® PressureTesting solution, IPT Global provides rapid, efficient, and transparent capping stack testing that reduces test time and ensures reliable deployment. Pressure tests can be viewed from anywhere with IPT Global’s Cloud-based SureTec platform, creating transparency for operators, drilling contractors, and regulators alike.
A capping stack is a device used to control the flow of oil and gas from a well in the event of an emergency or unplanned release of hydrocarbons.
The capping stack is usually placed on top of a wellhead, and it contains a number of valves and control systems that can be operated remotely to shut off the flow of oil and gas.
In the event of a well blowout or other emergency, a capping stack can be deployed to contain the release of hydrocarbons and prevent further damage to the environment.
Since the Deepwater Horizon incident in 2010, regulations have been put in place to require the availability of capping stacks as a response measure in case of a catastrophic incident.
In response to the Deepwater Horizon oil spill—one of the worst environmental disasters in history that sent millions of barrels of oil into the Gulf of America and continued for 87 days before the well was capped—the oil and gas (O&G) industry, government agencies, and regulators placed increased emphasis on well control and blowout prevention.
As a result, a consortium of oil and gas companies, including ExxonMobil, Chevron, ConocoPhillips, Shell, and BP, along with service companies (mainly Trendsetter Engineering) and through a working partnership with the United States (U.S.) government, designed and built a capping stack to address the increased awareness and importance of subsea well control and blowout prevention; the first subsea capping stack was deployed in 2011.
The subsea capping stack was specifically designed to be deployed in deepwater environments where traditional capping stacks were not effective. The device was capable of withstanding high pressures and temperatures and could be deployed using remotely operated vehicles (ROVs).
Prior to being deployed at the site of the Deepwater Horizon incident, the subsea capping stack was tested and validated in a series of simulated blowout scenarios. It was successfully used to cap the well, bringing the oil spill under control after 87 days of uncontrolled release.
Since then, subsea capping stacks have become a required component of offshore drilling operations, with regulations mandating their availability in case of emergencies. The development and deployment of subsea capping stacks have improved the ability to respond to well blowouts and other emergencies, minimizing the impact on the environment and human life.
The U.S. Bureau of Safety and Environmental Enforcement (BSEE) published new regulations in 2016 that require operators of offshore drilling operations in U.S. waters to have access to well capping systems capable of controlling the flow of hydrocarbons in the event of a blowout. These regulations have led to increased development and deployment of capping stacks.
Since 2011, more than a dozen capping stacks have been built and strategically positioned at locations around the world, ready for deployment at a moment’s notice. The two Gulf of America consortiums, MWCC and HWCG, maintain and develop this network, drawing on highly skilled employees, engineers, and contractors to keep each stack deployment-ready.
In any emergency situation, rapid response is critical to minimizing the impact of an incident. Great emphasis is placed on preparedness and response planning, including the pre-positioning of equipment and the training of personnel in well control and emergency response procedures. Not all well containment scenarios are the same, and many factors could influence the necessary response. If a capping stack is needed, it must be tested prior to deploying subsea. This includes a pressure test to validate the integrity of the capping stack to prevent an oil leak.
IPT Global’s SureTec PressureTesting solution provides well integrity assurance through the use of advanced algorithms to detect leaks. This is applied on capping stacks to determine the integrity of the capping stack prior to deployment. IPT Global provides clear and actionable results in real time that can be accessed on the SureTec platform to clients around the world.


IPT Global’s PressureTesting solution provides pressure testing assurance through a proprietary, physics-based analysis that compares the natural thermal pressure decay to detect leaks. Prior to March 2023, Trendsetter Engineering relied on the traditional method of pressure testing. Working together, however, IPT Global and Trendsetter Engineering created a pressure test procedure using this analysis that cut pressure testing time by two hours and reduced maintenance testing from two days to only one.
Because capping stacks are pressure tested prior to deployment, every minute counts in reducing the harm to the environment. Reducing that time is part of a broader industry effort to protect personnel, assets, and the environment. The goal is to never need a capping stack, but to be prepared to deploy one at a moment’s notice. IPT Global has helped MWCC and HWCG shorten testing time while delivering industry-leading integrity assurance.
Through the PressureTesting RemoteView module, capping stack pressure tests can be viewed in real-time from anywhere in the world. This creates transparency where operators, drilling contractors, consortium members, and regulators can witness and collaborate live during testing regardless of their location.
IPT Global collaborates with the consortium through the use of onshore maintenance testing and system integration testing prior to the deepwater deployment drill, and draws on its extensive industry experience to advise on testing criteria for this unique type of well control equipment.
Safety and transparency have guided IPT Global since our founding, and we’re proud to support the industry’s ability to deploy capping stacks with confidence through PressureTesting. Contact us to learn more about our capping stack testing capabilities.
IPT Global is pleased to share that Field Advisor Michael Barat-Arboine was recognized by ExxonMobil as ‘Catch of the Week’ for an important safety-related observation.
While working offshore, Michael noticed the maintenance pennants for a lifeboat did not have secondary retention to properly secure them to their mounts.
Michael called the bridge and notified them of the discrepancy and how important it is to ensure the pennants are properly secured with secondary retention. The bridge team immediately responded and installed secondary retention to ensure all possible dropped object hazards were eliminated.

At IPT Global, we take safety very seriously. We’re proud of the quick action Michael took to identify and report this issue, and it’s a great example of the vigilance our team brings to every job site. Our trained and experienced experts are what allows us to catch issues early and keep operations running safely and efficiently.
Contact us today to learn more about our commitment to operational and safety assurance.
Technological advances in offshore drilling have aided in overcoming well intervention challenges, increasing the number and total depth of wells drilled in deepwater and ultra-deepwater. Drilling in deeper water and at greater depths increases operators’ risk and reduces the margin of error regarding the protection of people and the environment. During drilling and completion of wells, IPT Global provides products and services that help assure well integrity and avoid well interventions to repair critical well components.
However, as the number and age of deepwater wells increases, so does the need for interventions due to the onset of other conditions like sand production, corrosion, hydrates, scale, mechanical failure, and water influx. Ongoing visibility into wellbore and equipment condition can help operators identify these issues before they progress to the point of requiring intervention. Each intervention is costly, and its outcome is uncertain. When interventions are necessary, IPT Global solutions and services also provide well integrity assurance.
Learn the risks and challenges faced by operators and intervention service companies when the decision is made to repair damaged or underperforming deepwater wells.

A well intervention involves taking the well offline and breaking the primary barrier of the subsea infrastructure and potentially the secondary barrier as well. The subsea infrastructure may have degraded after years on the sea floor. Because component configurations can change or degrade over time, having an accurate, current well schematic of the subsea equipment is essential before committing to a re-entry plan. A single intervention costs millions of dollars and the cause of the well problem may not be completely known when the intervention process starts. Therefore, re-entering a previously secure well in extreme conditions introduces additional risk to people, the environment, assets, and the operator’s reputation.
When intervention becomes necessary, the operator is focused on managing the cost of reestablishing production while maintaining safety and regulatory compliance. The cost and complexity of interventions are directly proportional to water depth as it determines the size of the intervention vessel and crew required. The intervention crew typically visits multiple well locations for various operators on a single tour to maximize the operational functionality of the vessel. Although this complicates scheduling of the vessel, it allows the cost of intervention services to be split across operators, reduces the travel time to each well, and minimizes port and duty costs.
Due to cost and scheduling complexity, operators want to avoid repeating the intervention process and suffering lost production again for a given well. The operators want to ensure the intervention tools and well control components work properly prior to connecting to the well. After the intervention, the operator also needs traceability of all integrity tests to hand off to the production team and to have an auditable trail of compliance for local regulatory bodies.
Integrity testing of well components during interventions presents different challenges as opposed to testing during well construction. An intervention may only last a couple of weeks, so component integrity tests are performed more frequently than during well construction. Many offline integrity tests are performed simultaneously on the deck of the intervention vessel to eliminate delays once the crew connects to the well. During intervention, integrity tests must be performed thoroughly and efficiently because any avoidable delay in critical path operations would be costly for both the intervention service company and the operator.
The final test in the intervention process is the negative pressure (inflow) test on the surface-controlled subsurface safety valve (SCSSV), a critical component that provides fail-safe closure to prevent uncontrolled flow in the case of catastrophic damage to wellhead equipment. A major challenge in the industry has been the lack of consistent test criteria by which to determine if the final inflow test passes or fails. This leads to inconsistent test results across rigs.
Post intervention, communication between the intervention service company and the production operations crew about the status of the well and the integrity of the well components is critical to a successful handover. Many problems and accidents have occurred due to poor handover documentation or communication. The intervention service company must provide accurate and comprehensive reports to all stakeholders.
From maintaining accurate well configuration records to executing and tracking integrity tests, IPT Global’s solutions and services support transparency during handover between intervention and production stages, and provide an auditable trail should any forensic work be required. Contact us to learn how IPT Global can support your well intervention needs.
Negative pressure testing, also known as inflow testing, offers oil and gas (O&G) companies a reliable way to test well barrier integrity. These tests are so critical that regulators have stepped in to require them via the Code of Federal Regulations (CFR) Title 30 § 250.721(g). IPT Global’s SureTec® PressureTesting solution is approved by the Bureau of Safety and Environmental Enforcement (BSEE) for inflow testing, giving operators a compliant path to meeting this requirement from day one.
During a negative pressure test, displacement occurs through the use of a lower density completion fluid, and with pressure lowered, the well barrier is monitored for leaks.
The benefits of negative pressure testing extend well beyond regulatory compliance. While these tests are required for anyone who operates an oil or gas well, they should be viewed as a valuable safeguard rather than a burden. Inflow tests are an effective tool for ensuring safety at the drill site, enabling efficient well operation, and avoiding costly damage down the line.
Here are a few reasons inflow testing is so important.
The wellbeing of the operations crew should be top-of-mind for any oil and gas company, whether workers are stationed on an oil rig or spend their time at another type of well. Drilling and maintaining a live well are risky jobs, so every step should be taken to ensure your team is protected. That starts by keeping a close eye on every potential failure point.
Inflow tests can identify well barrier integrity issues before they develop into something more serious. If a leak exists, the test will catch it, giving you an opportunity to address the issue and possibly prevent injury or — in the case of a catastrophic blowout — loss of life.
The purpose of your well is to extract oil or gas from the earth, and to do so efficiently. You want optimal performance — a benchmark you can’t achieve if there are issues with well barrier integrity.
If you fail a negative pressure test, it means the well production recovery process is being impacted. That typically means you are operating inefficiently, consuming the same amount of energy while falling below your peak recovery potential. Regularly scheduled tests help you diagnose slips in performance, even before you reach the point of failure, so you can make improvements and keep your well operating at a high level.
Not every well barrier breach develops into a disaster. In fact, some simply render a well inoperable for a short time period while repairs are made to fix the issue. This is what makes a proactive process like negative pressure testing so crucial; performing tests at regular intervals provides insight into how your well barrier is going to hold up in the future.
Negative pressure testing can indicate which aspects of the barrier are in good shape compared to areas where integrity is starting to slip test after test. With this data, you can plan for maintenance ahead of time instead of being forced into it at a moment’s notice. In the event of a failure, you could be responsible for costly repairs and replacements. Reconditioning your system while everything is still intact will save you time and money.
IPT Global has decades of experience helping the oil and gas industry perform reliable negative pressure tests. Companies rely on IPT Global’s SureTec PressureTesting solution for its consistent and accurate testing methodology, as well as for reviewing data and documenting trends both on-site and remotely.
To learn how IPT Global’s PressureTesting solution can support your negative pressure and inflow testing needs, contact IPT Global today.
A single event involving the malfunction or failure of a blowout preventer (BOP) component on a drilling rig can result in unplanned downtime, costing millions of dollars. These events can add up throughout the equipment’s lifecycle to a significant amount of cost and lost time. Due to uncertainty about the lifecycle of BOP stack components, drilling contractors may arbitrarily replace components during scheduled maintenance to try to mitigate unplanned downtime.
Additionally, history has shown that a malfunctioning BOP component can result in a loss of well control, threatening the safety of people, assets, and the environment. Because of the significant safety risks, the Bureau of Safety and Environmental Enforcement (BSEE) established regulations that require operators to use real-time monitoring (RTM) on subsea BOPs, surface BOPs on floating facilities, and wells in high-pressure, high-temperature (HPHT) environments.
This case study describes how IPT Global’s SureTec® Equipment Health Monitoring solution helped a customer identify a malfunctioning BOP control system component so it could be replaced during scheduled maintenance, before it caused an interruption in drilling operations or a loss of well control. It also outlines the BSEE real-time monitoring requirements that apply to these operations.
IPT Global provides full monitoring services of well control equipment (WCE) and downhole drilling data. For BOPs, this work runs on the SureTec Equipment Health Monitoring solution, which pairs continuous equipment data with review by IPT Global’s BOP analysts. The solution includes four modules: Monitoring for real-time tracking of BOP control system data, HealthAnalytics for trend analysis that supports maintenance planning, FaultTree for fault tree analysis of BOP functions, and ComplianceReady for documenting regulatory compliance.
This combined approach of monitoring plus advanced data analytics elevates the maintenance program from schedule-based to condition-based, improving efficiency and reducing risk.
Historically, failures have driven BOP maintenance response. Equipment Health Monitoring shifts that approach from reactive to proactive. Real-time alarms and alerts show teams how equipment is performing, so they can address problems before a failure happens.
In early 2022, an IPT Global BOP analyst was using Equipment Health Monitoring to track the condition of a surface BOP control system on a jack-up rig in the Gulf of America. The experienced and trained analyst was able to identify a possible failure ahead of an event, ensuring the rig avoided unplanned downtime.
In this example, the issue was with the BOP manifold regulator, which was supplied with 3,000 psi from the accumulator bank. The manifold regulator reduces the supply pressure to 1,500 psi for operation of the BOP pipe rams, blind shear rams (BSRs), and choke and kill valves. While monitoring the accumulator, the BOP analyst noticed that the manifold regulator showed an increased leak-off rate after the BSRs were functioned closed (see graph below).
In this case, the 1,500 psi manifold regulator pressure was deviating by more than 25 percent. Although it is not uncommon for a regulator’s pressure to vary, the BOP analyst knew that the level of deviation likely indicated an imminent component failure or a leak in the hydraulic circuit.

After our BOP analyst logged the event, the customer was notified of anomalous regulator behavior. When IPT Global provided comparative trends from other regulators, the drilling supervisor determined that the regulator should be replaced during scheduled maintenance to avoid disrupting future drilling operations.
The customer replaced the regulator before commencing drilling operations on a sister well. Subsequent BOP monitoring showed that the new regulator was operating normally. Notably, the customer also provided the new regulator’s certification for documentation in IPT Global’s database for future lifecycle tracking.
IPT Global’s Equipment Health Monitoring solution and the customer’s proactiveness to replace the manifold regulator potentially avoided a very expensive BOP failure during drilling operations, as well as reduced risk to personnel and the environment. The outcome also shows how drilling contractors can reduce expenses by focusing on components that need to be replaced during scheduled maintenance rather than arbitrarily replacing components.
The BSEE Code of Federal Regulations (CFR) requires operators to provide real-time monitoring (RTM) for BOPs in the Gulf of America. BSEE CFR Chapter II – Subchapter B – §250.724 (a) describes the RTM requirements as follows.
(a) When conducting well operations with a subsea BOP or with a surface BOP on a floating facility, or when operating in a high-pressure, high-temperature (HPHT) environment, you must gather and monitor real-time well data using an independent, automatic, and continuous monitoring system capable of recording, storing, and transmitting data regarding the following:
(1) The BOP control system;
(2) The well’s active fluid circulating system; and
(3) The well’s downhole conditions with the bottom hole assembly tools (if any tools are installed).
SureTec Equipment Health Monitoring gives operators and drilling contractors a clearer view of how critical BOP components perform over their lifecycle. With that information, teams can plan maintenance around actual equipment condition, replace components when the data shows a need, and reduce the risk of unplanned downtime.
To learn how Equipment Health Monitoring can support your BOP maintenance program, contact our team.
Most digital pressure testing applications on the market regularly pass leaks due to analysis that is not rooted in the physics of well operations. Operators and drilling contractors should be concerned that these black-box digital solutions are used to validate high-pressure tests on critical rig equipment.
The lack of accurate leak detection on blowout preventers (BOPs), production trees, and well barrier elements (WBE) increases the risk of process safety incidents, which puts operations at risk of harming the environment, people, and assets.
Many digital pressure testing alternatives falsely claim to be predictive by using a curve extrapolation for pressure decline analysis. There is no truly predictive product on the market that is based in well operation physics. However, one digital pressure testing solution using advanced analysis algorithms has transformed one of the industry’s most consequential assurance activities.
This case study shows how IPT Global’s SureTec® PressureTesting solution, using algorithms developed with the world’s largest pressure testing database, detected potential leaks that were missed by a competing digital pressure testing vendor in two high-pressure tests. Importantly, these tests were during live operations offshore.
Decline analysis uses a percentage of the required test pressure as the criteria to determine the allowable pressure drop over a given period (typically 5 minutes). For example, if a system has a test pressure of 10,000 psi and the vendor selects 0.5% as the decline criteria, then the acceptable pressure loss is calculated as follows:
Acceptable Pressure Loss = (Criteria x Test Pressure) = 0.005 x 10,000 psi = 50 psi
The same decline criteria and required test pressure were used in high-pressure tests on a cement unit and a low torque valve shown in Figures 1 and 2, respectively. During the tests, two data points (A and B) were selected five minutes apart by the competitor software. Using the above decline criteria, both tests passed because the respective pressure losses of 49 psi and 48 psi were less than 50 psi.
Using decline criteria alone to validate critical components ignores the thermal effects of pressurization on the system. Pressurization increases the temperature of the system, and the pressure decreases when the system cools during shut in.
It’s the same effect that occurs when car tires lose pressure in the winter. As a result, when the system is shut in to monitor the pressure, part of the pressure drop is due to cooling of the test fluid as the system loses heat to the surroundings. Because of its simplicity, standard digital testing utilizing decline analysis cannot distinguish between pressure loss due to thermal effects and pressure loss due to a potential leak.

EXAMPLE 2: Example of a competitor digital solution passing a test with a pressure loss of 48 psi. This large pressure drop was allowed due to a lack of advanced algorithms, only available through IPT Global’s SureTec PressureTesting solution. PressureTesting removed the thermal influence and identified a leak on the lower torque valve.
To demonstrate that competing digital approaches are inadequate for leak detection, the same tests were analyzed using IPT Global’s PressureTesting solution with a field-tested, physics-based advanced analysis. This analysis uses strict criteria to detect a leak with a high level of confidence.
The IPT Global analysis failed the same tests that passed using a competing digital solution. IPT Global was able to differentiate thermal influences as the test fluid cooled off during testing.
Accurate leak detection depends on testing methods that go beyond simple curve extrapolation. IPT Global’s PressureTesting solution applies physics-based layered algorithm validation to confirm the integrity of critical equipment and well barrier elements with objective, repeatable results.
Contact us to learn how PressureTesting’s leak detection capabilities can support your operations.
Well barriers consist of one or more well barrier element (WBE), and the failure of a single WBE can cause the well barrier to fail. When well integrity is compromised by the failure of a well barrier, it can result in loss of production and harm to people, the environment, assets, and the operator’s reputation. The lack of validation criteria and the subjective interpretation of test results for critical WBEs are root causes of well integrity issues in the oil and gas (O&G) industry. Addressing those root causes starts with how WBEs are tested and validated.
IPT Global’s SureTec® PressureTesting solution uses proprietary algorithms and strict validation criteria to remove subjectivity from WBE testing and reduce pressurized time, saving rig time and lowering risks.
Many operators still verify well barrier integrity with circular chart recorders (CCRs). A BSEE report identified several problems with this approach, including:
SureTec PressureTesting addresses these issues highlighted in the BSEE report with objective validation criteria, less pressurized time, and complete test documentation. For a closer look at how the two approaches compare in the field, see From Circular Chart Recorders to Digital Pressure Testing, which covers a four-rig operator trial.
There are four areas where converting to digital pressure testing can have a significant, positive impact on operations:
Digital validation with SureTec is more accurate than CCRs and uses transparent and objective criteria for validating pressure tests. SureTec uses physics-based algorithms to provide enhanced analysis for the most rigorous and effective testing in the industry. Our algorithms use transparent criteria that has been validated against an expansive database of over 100,000’s of pressure tests. The subjective interpretation of CCR tests is prone to human error.
SureTec provides a 30% reduction in test time versus CCRs by eliminating subjectivity and unnecessary pressurized time. Due to the accuracy of the testing with SureTec, the need to retest is eliminated. This improves safety by removing unnecessary pressurized time, which puts people, the environment, assets, and reputation at risk.
SureTec provides comprehensive test reports to assure reliable handover with complete documentation. SureTec consists of tools that allow users to create custom schematics, visualize pressure paths, and compare tests. Tests can be overlayed to show rate of change (ROC) differences, pressure paths, and barriers throughout each step of a well’s lifecycle.
SureTec reduces costs by decreasing test time and increasing accuracy. This lowers risks, workforce hours, transportation, expenses from incidents, and reputation devaluation.
Going digital is only part of the picture, though. The analysis method behind the data matters just as much.
Percent decline analysis is the minimum requirement set by industry regulators and is used by some pressure testing technology companies. It’s a simple calculation that divides the system pressure drop by a fixed time interval (e.g., 30 minutes). Because the validation criteria are based on a percentage of required test pressure, the allowable pressure drop changes with the test pressure. As a result, percent decline can’t consistently detect a leak or differentiate between a leak and thermal effects on the test fluid.


IPT Global’s SureTec PressureTesting solution goes beyond percent decline analysis with its advanced physics-based algorithms and multi-dimensional verification. Each algorithm adds a layer of verification that percent decline analysis can’t provide on its own. In fact, of the digital pressure testing methods available, percent decline analysis offers the lowest level of integrity assurance, so it should not be used alone to validate WBE integrity.
To see how these methods work in more detail, request our white paper, Advanced Well Integrity Management With SureTec, or contact IPT Global to talk through how SureTec PressureTesting could fit your well barrier testing program.
Positive pressure tests confirm that a wellbore can hold up under its design conditions, making them a cornerstone of safe well operations. Regulatory bodies and operating company policies typically set the requirements for how these tests are run. Yet for over a century, the oil and gas (O&G) industry has relied on circular chart recorders (CCRs) to capture that data, with a person interpreting the results by hand.
Circular chart recorder analysis is still a widely accepted method for collecting pressure test records, but the resulting data has limited use beyond the initial read. Its format makes it difficult to evaluate afterward or apply to newer technologies, such as artificial intelligence (AI) applications.
To this day, circular chart recorders are still used to perform pressure tests on countless oil wells around the world. But there is a risk when using this method, which stems from its reliance on subjective human interpretation. If the human interpretation is incorrect, the consequences can be severe.
A positive pressure test is intended to be scored using an objective pass-fail evaluation. Reliance on human interpretation when using circular chart recorders, however, introduces inconsistency.
During analysis, a human evaluator could miss a fine detail due to the low resolution of circular chart recorders and give the test a pass to continue operation. Conversely, post-test evaluation by a different approving party could disagree with the initial analysis, resulting in re-testing critical components that leads to both increased pressurized time and operating costs.
In many locations, pressure test records are required to be submitted to meet regulatory expectations. Pressure testing is meant to provide assurance of well integrity and inform the operator their well is functioning safely, yet misinterpretation of circular chart recorder testing results or analysis can result in undesirable outcomes and failure to protect people, assets, the environment, and the operating company’s reputation.
IPT Global’s SureTec® PressureTesting solution offers a better way.
IPT Global is the pioneer in digital pressure testing for well integrity. SureTec PressureTesting is an all-digital, physics-based solution for positive pressure testing that focuses on consistency, objectivity, accuracy, and safety.
All tests are performed using consistent parameters, offering definitive results by analyzing data against objective pass-fail criteria. High-resolution digital recording ensures the accuracy of results and simplifies the process of documenting and reporting data through automation.
With the SureTec platform, clients can view their pressure testing data from anywhere in the world. SureTec is a web-based platform that enables simple navigation of test results from local or remote wells, reviewal of test history, and more.
With all pressure testing data in one location, it is easier to spot trends and gain a sense of where operations stand. Moreover, experts in our Real-Time Operations Center (RTOC) are available 24/7 to provide additional support and answer questions.
Contact IPT Global today to learn how SureTec PressureTesting can help your team reduce uncertainty and strengthen confidence across well assurance activities.