Well barrier management — the process behind the design, implementation, and maintenance of barriers — is an essential part of any successful drilling operation. The more effective a well barrier is, the longer a well can operate unimpeded. IPT Global showcased SureTec® WellSchematic, a cloud-based solution that simplifies wellbore schematic creation and barrier diagram generation, at the 2026 IADC/SPE International Drilling Conference in Galveston, Texas. It integrates visualizations, testing data, and collaborative processes into one solution, allowing users to visualize the full barrier envelope in real time. In this video interview with Drilling Contractor Magazine on 17 March, Cody MacDonald, Chief Technology Officer at IPT Global, discussed the insights that the software can provide.
News
Cloud-Based Platform Enables Real-Time Barrier Analysis Throughout Well Lifecycle
Recent Posts
Case Studies
BOP Test Plan Optimization Cuts Critical Path Test Time by 14% with SureTec PressureTesting
One Test Plan Review Saved a Supermajor Operator Over $40,000 per BOP Test; Projected Savings Over $700,000 a…
Read more
News
IPT Global Receives Historic BSEE Approval for Primary Validation of Inflow Tests in the Gulf of America
HOUSTON, Texas – March 2, 2026 – IPT Global, the pioneer and recognized global leader in digital well…
Read more
Case Studies
How IPT Global’s SureTec PressureTesting Solution Delivered 20% Faster BOP Pressure Testing in Offshore Field Trials
Blowout preventer (BOP), the well control equipment central to the BOP pressure testing and well barrier verification results…
Read more
