SureTec: Managing Well Integrity over the Entire Well Lifecycle

May 25, 2023 7 min read
Diagram of well barrier configurations across six lifecycle phases: pre-deployment, drilling, completion, production, intervention, and plug and abandonment

Well integrity is determined by the reliability of well barrier elements (WBEs) to prevent the uncontrolled release of fluids from an oil and gas (O&G) well into the environment. The consequences of the loss of well barrier integrity can be severe, ranging from environmental damage to fatalities. Sustaining well integrity throughout a well lifecycle is critical in minimizing risk due to failed WBEs.

However, a well’s operating conditions or utilization may change as the well ages, adversely affecting the integrity of critical WBEs. It’s difficult to maintain consistency in well integrity over the years through knowledge transfer and documentation handover among teams. To close that gap, IPT Global provides a centralized Cloud-based platform, SureTec®, that manages well integrity data and regulatory compliance through each phase of a well’s life, from drilling, completion, and production to workover, intervention, and plug and abandonment (P&A).

Drilling & Completion (Construction)

During drilling and completion, the SureTec platform supports well integrity management by bringing barrier verification design, planning, testing, and reporting into one integrated system across the well lifecycle.

Well Integrity Test Planning

Operators use the SureTec WellSchematic solution to build wellbore schematics and barrier diagrams, and the SureTec PressureTesting TestPlanner module to build test plans for drilling and completion. Together, they generate a standardized, detailed test plan report with schematics, criteria, and complete documentation of surface and subsea components to be tested. The tests plans can be digitally routed for approval and securely stored in SureTec’s Cloud-based platform.

Well Lifecycle Integrity Testing Approval Workflows

IPT Global’s SureTec allows signatories to download and review drilling and completion test plan reports, and it simplifies the gathering of digital approvals via mobile devices. It streamlines collaboration and communication by rerouting rejected test plans and test reports for modifications and final approval.

Screenshot of an email and mobile notification alerting a reviewer that a wellbore test report is ready for approval.
Email and mobile notification from SureTec alerting a reviewer that a wellbore test report is ready for approval.

Test Execution

Performing accurate, comprehensive, and efficient integrity tests during drilling and completion is a challenge in high-pressure, high-temperature (HPHT) environments. It requires comprehensive well integrity management software and effective collaboration between the operator and service company performing the tests. An accurate, consistent, and transparent methodology is necessary for validating and managing the integrity of WBEs. IPT Global’s patented, physics-based algorithms evaluate pressure test data based on objective criteria and definitively confirm whether an integrity test passed or failed. Reports for completed tests are automatically uploaded to the Cloud and routed for digital approval using SureTec PressureTesting’s DigitalApprovals module. Likewise, PressureTesting’s RemoteView module provides remote viewing of active tests from anywhere in the world, test data archival and retrieval, and advanced data visualization analysis.

IPT Global’s industry-leading experts collaborate with operators and drilling contractors both on-site and remotely through its Real-time Operations Center (RTOC). Field Service Advisors provide on-site integrity test coordination and optimization, Engineers perform post-test reviews to ensure all components are properly tested, Real-Time Operations Engineers & Advisors (RTOAs) verify that test reports are published properly to assure the traceability of all integrity tests for hand-off to the production team, and BOP Compliance Surveyors provide third-party equipment inspection and auditing using industry recommended survey and inspection practices.

Maintaining BOP Integrity During Drilling

Blowout preventers (BOPs) serve as a critical secondary barrier during drilling. The challenge for drilling contractors and operators is to know when to repair or replace BOP components to minimize non-productive time (NPT) due to component malfunction or failure. Regulations require operators to periodically pressure test and function test BOP stack components to ensure well integrity. Contractors perform weekly function tests to actuate the rams and annular preventers to ensure they will operate properly in an emergency. The actuation duration and volume of hydraulic fluid required are important indicators of the health of critical BOP components.

IPT Global engineers monitor and analyze BOP pressure tests, BOP function tests, maintenance, and failure data to gain insight into when and why failures occur. Engineers use data visualization to spot trends in pressure and function test data so that contractors can repair and replace BOP components, when necessary, rather than on an arbitrary schedule as commonly used.

Production

During the production phase of the well lifecycle, there are a different set of challenges to maintaining integrity while optimizing production. These challenges include complex physical and chemical process changes that occur in the wellbore and surrounding formations. Adding to this complexity, aging oil and gas wells become more prone to corrosion, erosion, and other forms of wear and tear that can compromise well integrity. The production team must decide when to intervene and extend production or retire a well that is no longer safe or economically viable.

IPT Global’s SureTec solution ensures complete documentation handover to the production team. It gives the team access to WBE integrity data and reports for transparency and compliance. It also allows the team to compare integrity data with other wells to identify potential issues before they become major problems.

Workovers & Interventions

Integrity testing of well components during light and heavy (workover) interventions presents different challenges compared to testing during well construction. As interventions have a shorter duration of a few weeks, component integrity tests are carried out more frequently compared to the construction of a well. Many offline integrity tests are performed simultaneously on the deck of the intervention vessel to eliminate delays once the crew connects to the well.

Multi-testing capability enables the crew to perform integrity tests thoroughly and efficiently to avoid delays in critical path operations that would be costly for both the intervention service company and the operator. After the intervention is completed, there is traceability of all well integrity tests to hand off to the production team and for compliance with local regulatory bodies.

Screenshot of real-time pressure test monitoring showing four concurrent tests with live pressure and rate charts
Real-time pressure test monitoring showing four concurrent tests with live pressure and rate charts.

Plug & Abandonment

Compliance regulations that govern plug and abandonment (P&A) regulations can vary across jurisdictions, which makes compliance challenging for operators with international assets. Operators must comply with these regulations to ensure safe and environmentally responsible operations. Regulations typically cover a range of areas, such as casing and cementing requirements, pressure testing procedures, and monitoring and reporting requirements.

A critical aspect of compliance with P&A regulations is the need for integrity management of well barrier elements (WBE). Well integrity management software like SureTec can be used to provide historical data on each WBE. This data can help operators identify potential issues that may arise during the abandonment process, such as defective equipment or oil leaks. All P&A activities can be tracked and documented, providing a comprehensive record of the operation ensuring compliance with regulations are met. With this data, operators can take steps to ensure the well is abandoned safely and mitigate risks.

Well Integrity Management for the Life of the Well

Ensure the reliability of well barrier elements over the entire well lifecycle. Implement IPT Global’s SureTec platform to manage well integrity data, regulatory compliance, and integrity testing through each phase of the well’s life. With WellSchematic and PressureTesting, you can strengthen well integrity management during drilling and completion, maintain BOP integrity, and support production and P&A compliance.

Contact us to learn how IPT Global can help you manage well integrity throughout the well lifecycle.